This is where the technical, statutory, and consultation documents that underpin Project Beacon live. The collection has been built during several years of design, consultation and statutory consenting work. We have made it public so that anyone who wants to engage with the detail of the project can do so.
Accessibility Report
An audit of the architect floor plans with suggested alterations to improve access to all areas for disabled users.
Architect Drawings
Existing and proposed floor plans, site plans, elevations, and sections, prepared as part of the planning and faculty submissions.
- Choir Stall Pew And Kneeler Alterations, May 2025
- Existing Elevations, Oct 2024
- Existing First Floor, Oct 2024
- Existing Floor Details, May 2025
- Existing Floor Scoping Plan – Ground And Basement, May 2025
- Existing Ground Floor, Oct 2024
- Existing Sections A And B, Oct 2024
- Existing Site Plan, Oct 2024
- Location Plan, Oct 2024
- Memorial Screen And Ramp Impaired Site Drawing, Aug 2025
- Pew And Kneeler Section Details, June 2025
- Proposed East Elevation, Oct 2024
- Proposed External Ledger Stone Relocation Plan, Aug 2025
- Proposed First Floor Plan, June 2026
- Proposed Floor Details, May 2025
- Proposed Floor Scoping Plan – First, May 2025
- Proposed Floor Scoping Plan – Ground And Basement, May 2025
- Proposed Ground Floor Plan, June 2026
- Proposed North And West Elevations, Oct 2024
- Proposed Roof Plan, June 2025
- Proposed Section A, Dec 2024
- Proposed Section B And C, Dec 2024
- Proposed Section D, Nov 2024
- Proposed Section E, Nov 2024
- Proposed Site Plan, August 2025
- Proposed South Elevation, Dec 2024
- Tower Arch Infill Plan June 2025
Architect Reports
The Design and Access Statement and Heritage Assessment that accompanied the planning and faculty applications.
Consultations
Summaries and survey results from the multiple phases of community consultation we have undertaken since 2022.
Energy Report
A detailed energy report, issued in June 2026 by a local company Watsons Building Services Ltd, incorporates specialist advice received from Purelec Energy Ltd (a PV advisor and supplier). This sets out the project’s net zero analysis, together with various energy solutions, including a recommended sustainable hybrid energy plan. This plan incorporates PV panels on the south-facing church roof, a Solar Edge converter, battery storage, an air source heat pump, underfloor heating, gas boiler and radiators.
Environmental Reports
Ecology, biodiversity, tree, bat, and archaeological assessments commissioned to support the planning application.
- Arboricultural Impact Assessment Plan, Dec 2024
- Arboricultural Impact Assessment, Dec 2024
- Arboricultural Survey Data, Dec 2024
- Archaeological Assessment, March 2020
- Archaeological Scheme Of Investigation, Aug 2025
- Asbestos Survey, Dec 2024
- Bat Emergence Survey Report, Oct 2024
- Bio Diversity Net Gain Assessment – Baseline, Nov 2024
- Bio Diversity Net Gain Assessment – Post Development, Dec 2024
- Geophysical Report, Feb 2024
- Geophysical Team’s Explanatory Email, May 2024
- Ground Investigation Report, Dec 2024
- Preliminary Ecological Appraisal Report, Oct 2024
- Tree Protection Plan, Dec 2024
- Tree Survey And Constraint Plan, Dec 2024
Faculty Consent
Documentation from the Diocese of Leeds confirming Church of England approval for the works.
Fundraising
Documents to support our fundraising effort: Gift Aid form, easyfundraising information, and the Case for Support.
Heritage Reports
Heritage condition assessment and relocation methodology report; full church building record per Historic England guidance (for archival deposit).
Letters of Support
Letters of support from public figures and bodies.
Planning Consent
The planning permission, listed building consent and officer reports issued by Bradford Council, together with HM Land Registry documents.
Presentations
Slides used in design and consultation presentations.
Statements
The Statement of Needs and the Statement of Significance (with supporting annexes), together with an Executive Summary of the Faculty Application documents, produced for the Chancellor.
- Executive Summary, Sept 2025
- SoS Annex 1 – Inventory Of Furnishings And Fittings
- SoS Annex 2 – Affected Significant Assets
- SoS Annex 3 – Photos Of Furnishings And Fittings
- SoS Annex 4 – Monument Photos
- SoS Annex 5 – Inventory And Photos Of Stained Glass Windows
- Sos Annex 6 – Location Plan Of Stained Glass Windows
- Statement Of Need Ancillary Documents, June 2025
- Statement Of Need, August 2025
- Statement Of Significance (SoS), August 2025
Structural Reports
Reports and surveys relating to structure, drainage and M&E.