Project Documents

This is where the technical, statutory, and consultation documents that underpin Project Beacon live. The collection has been built during several years of design, consultation and statutory consenting work. We have made it public so that anyone who wants to engage with the detail of the project can do so.

Accessibility Report

An audit of the architect floor plans with suggested alterations to improve access to all areas for disabled users.

Architect Drawings

Existing and proposed floor plans, site plans, elevations, and sections, prepared as part of the planning and faculty submissions.

Architect Reports

The Design and Access Statement and Heritage Assessment that accompanied the planning and faculty applications.

Consultations

Summaries and survey results from the multiple phases of community consultation we have undertaken since 2022.

Energy Report

A detailed energy report, issued in June 2026 by a local company Watsons Building Services Ltd,  incorporates specialist advice received from Purelec Energy Ltd (a PV advisor and supplier). This sets out the project’s net zero analysis, together with various energy solutions, including a recommended sustainable hybrid energy plan. This plan incorporates PV panels on the south-facing church roof, a Solar Edge converter, battery storage, an air source heat pump, underfloor heating, gas boiler and radiators.

Environmental Reports

Ecology, biodiversity, tree, bat, and archaeological assessments commissioned to support the planning application.

Faculty Consent

Documentation from the Diocese of Leeds confirming Church of England approval for the works.

Fundraising

Documents to support our fundraising effort: Gift Aid form, easyfundraising information, and the Case for Support.

Heritage Reports

Heritage condition assessment and relocation methodology report; full church building record per Historic England guidance (for archival deposit).

Letters of Support

Letters of support from public figures and bodies.

Planning Consent

The planning permission, listed building consent and officer reports issued by Bradford Council, together with HM Land Registry documents.

Presentations

Slides used in design and consultation presentations.

Statements

The Statement of Needs and the Statement of Significance (with supporting annexes), together with an Executive Summary of the Faculty Application documents, produced for the Chancellor.

Structural Reports

Reports and surveys relating to structure, drainage and M&E.

Quantity Surveyor Costings